Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
HMA Percent Within Limits (PWL) and Single Test Acceptance (STA)
Instructions to Use PWL Program
Important, please read the above instructions before saving and opening your worksheet.
HMA Percent Within Limits (PWL) Excel Worksheet
Use this worksheet in conjunction with the frequently used special provision titled Superpave Hot Mix Asphalt Percent Within Limits. Also use this worksheet in conjunction with the frequently used special provision titled Superpave Hot Mix Asphalt Percent Within Limits for Capitol Preventive Maintenance One Course Overlay Projects.
HMA Single Test Acceptance (STA) Excel Worksheet
Use this worksheet in conjunction with the frequently used special provision titled Superpave Hot Mix Asphalt Percent Within Limits. Also use this worksheet in conjunction with the frequently used special provision titled Superpave Hot Mix Asphalt Percent Within Limits for Capitol Preventive Maintenance One Course Overlay Projects.
HMA Percent within Limits (PWL) for Stone Matrix Asphalt (SMA) Excel Worksheet
Use this worksheet in conjunction with the frequently used special provision titled Hot Mix Asphalt Percent Within Limits for Stone Matrix Asphalt. Also use this worksheet in conjunction with the frequently used special provision titled Hot Mix Asphalt Percent Within Limits for Capital Preventive Maintenance Projects for Stone Matrix Asphalt.
Contact
John Barak, Bituminous Supervising Engineer
517-636-4929
Michelle Miller, HMA Mix Design Engineer
517-256-6799