Skip to main content

M-14 Ann Arbor Noise Analysis

About the study

In 2024, Public Act 121 of 2024 directed MDOT to evaluate the traffic noise on M-14 from Newport Rd. to North Maple Rd. in Ann Arbor. This study analyzed existing and future noise levels and evaluated potential abatement methods, if any, that could improve the traffic noise environment for the public schools within the study area. The noise study analyzed noise impacts and potential noise mitigation. 

This study is not connected or related to any past, current or future MDOT road or bridge project.

M-14 Ann Arbor Noise Report (draft)

  • M-14 interactive StoryMap

Frequently asked questions (FAQs)

  • When is MDOT required to do a traffic noise analysis?

  • When does a traffic noise impact occur?

  • What are the types of noise abatement?

  • Will vegetation help reduce noise levels?

  • Will a noise barrier be built if the project results in a traffic noise impact?

Stay connected

Media questions? Contact Aaron Jenkins, Media Representative, at 517-243-9075.

  • Submit a comment

  • Study questions?

    Mike Davis, Jr., University Region Planner
    517-750-0401