Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
MDOT has prepared an Environmental Assessment (EA) and Preferred Alternative (PA) for the proposed rebuilding and widening of a 2.7-mile section of M-37 (Broadmoor Avenue/Cherry Valley Avenue SE) in Caledonia Charter Township and the Village of Caledonia.
The proposed project will extend the existing boulevard of M-37 from where it currently ends north of 76th Street south to 92nd Street to address operational and safety needs in this growing area. The EA describes and analyzes the proposed work and measures taken to minimize impacts in the area.
To request accommodation for complex maps and renderings related to this project, contact the project manager or public involvement specialist.
Contacts
Thomas Sabin | 616-464-1800
Project manager
John Richard | 616-262-1565
Media representative
Frequently asked questions (FAQs)
-
What is the purpose and need for this project?
-
What alternatives are MDOT considering for this project?
-
What are the project study limits?
-
What is the timeline for the project?
-
How is the project being funded?