Project information
Scope
Statewide deployment of National Electric Vehicle Infrastructure (NEVI) compliant charging infrastructure along Michigan’s Alternative Fuel Corridors (AFC). The scope of work includes the design, construction, operations, and maintenance of electric vehicle (EV) charging sites deployed as part of this project. A typical NEVI site includes a minimum of four network-connected direct current (DC) 150 kilowatt (kW) charging ports capable of simultaneously and continuously charging four EVs, located within one mile driving distance of a Michigan AFC, and available for use by the public. Operations and maintenance (O&M) of the EV charging infrastructure must be provided for at least five years following the date when the EV charging station is commissioned.
Round 2 is requesting NEVI compliant charging infrastructure within 43 gaps as shown on map.
National Electric Vehicle Infrastructure Formula Program
Job number
221278
Delivery method
Design-Build-Operate-Maintain (DBOM)
Contact
Jon Harden, Innovative contracting project manager
231-262-2955
Estimated cost
Construction cost: $37,000,000
Anticipated schedule
Industry forum: July 2024
Issue request for proposals (RFP): November 2024
Proposals due: March 14, 2025, 1:00 pm (EST)
Anticipated award: August 2025