Skip to main content

Open house for 2027 US-12 resurfacing project in Bronson

2026-09-22T16:00:00 2026-09-22T19:00:00 Open house for 2027 US-12 resurfacing project in Bronson

MARSHALL, Mich. - MDOT is holding a public open house to discuss a planned 2027 project to resurface US-12 from Albers Road to Wayne Street in Bronson, Branch County, and convert the four-lane roadway to three lanes with a dedicated left-turn lane.

Accessibility:
Attendees who require mobility, visual, hearing, written, or other assistance for effective participation should contact Orlando Curry at 517-241-7462 or CurryO@Michigan.gov, preferably at least five business days prior to the scheduled meeting. Forms are located on the Title VI webpage. Requests made after this timeframe will be evaluated and honored to the extent possible.

Project information:
Tentatively planned for about four weeks during summer 2027, this project includes chip and fog sealing US-12 between Albers Road and Wayne Street. There also is a proposal to implement traffic calming measures to improve safety for motorist and pedestrians, including converting the roadway from four lanes to three with a dedicated center left-turn lane.

Bronson City Hall 141 S. Matteson St. Bronson, MI 49028
Location
Bronson City Hall
141 S. Matteson St.
Bronson, MI 49028
Event Date

Start: September 22, 2026 4:00 PM

End: September 22, 2026 7:00 PM

Contact Information
Nick Schirripa

Southwest Region Media Representative

MARSHALL, Mich. - MDOT is holding a public open house to discuss a planned 2027 project to resurface US-12 from Albers Road to Wayne Street in Bronson, Branch County, and convert the four-lane roadway to three lanes with a dedicated left-turn lane.

Accessibility:
Attendees who require mobility, visual, hearing, written, or other assistance for effective participation should contact Orlando Curry at 517-241-7462 or CurryO@Michigan.gov, preferably at least five business days prior to the scheduled meeting. Forms are located on the Title VI webpage. Requests made after this timeframe will be evaluated and honored to the extent possible.

Project information:
Tentatively planned for about four weeks during summer 2027, this project includes chip and fog sealing US-12 between Albers Road and Wayne Street. There also is a proposal to implement traffic calming measures to improve safety for motorist and pedestrians, including converting the roadway from four lanes to three with a dedicated center left-turn lane.