Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
Lane closure for Portage Lake Lift Bridge project Dec. 18-22
December 14, 2023
From Monday, Dec. 18, through Friday, Dec. 22, motorists should expect the northbound outside lane on the bridge to be closed to vehicle traffic during daytime hours. The northbound sidewalk will remain closed with a posted pedestrian detour.
The work is part of the $4.3 million Michigan Department of Transportation (MDOT) investment to replace bridge elevators and install false decking under one bridge span. The decking work was completed earlier this year.
This repair project will help ensure continued safe and reliable operation of the bridge.
Media Contact: