Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
M-139 closure in Niles Township starts Monday
March 07, 2024
COLOMA, Mich. - The Michigan Department of Transportation (MDOT) will be closing M-139 between M-140 and Ullery Road starting Monday, March 11, to Friday, May 3, for repairs to the Franz and Norton Drain culvert, followed by restoration work until June 7.
Work will include removing and replacing the damaged section of the box culvert, sheet piling, backfill, installation of erosion control measures in the drain, drainage improvement to local driveways, and restoration after construction.
County:
Berrien
Highway:
M-139
Closest city:
Niles
Start date:
Monday, March 11, 2024
Estimated end date:
Friday, June 7, 2024
Traffic restrictions:
During the March 11 – May 3 closure, traffic will be detoured on M-140 and Ullery Road.
From May 3 through the completion of the work, there will be single-lane closures on M-139.
Jobs numbers:
Based on economic modeling, this investment is expected to directly and indirectly support 11 jobs.
Safety benefit:
This project will repair the damage section of the box culvert, extend the service life, and prevent future maintenance on the culvert.
Media Contact: