Be aware of fake MDOT texts demanding toll or traffic ticket payments. MDOT does not operate any toll roads. Contact the Michigan Attorney General for information on how to identify scams and file a complaint.
Lane closures for UP bridge inspections June 5-11
June 02, 2026
HOUGHTON, Mich. - Crews from the Michigan Department of Transportation (MDOT) will be performing routine bridge inspections on structures in the Upper Peninsula from June 5 to 11. The inspections will require intermittent closures.
The following closures are scheduled for the inspections. The work is weather-dependent:
- Friday, June 5: The M-26 bridge over the Eagle River will have lane closures under flag control from 9 a.m. to 3 p.m.
- Saturday, June 6: The M-64/M-38 bridge over the Ontonagon River and River Road will have shared-use path closures from 8 a.m. to 2 p.m. and shoulder closures from 2 to 4 p.m.
- Monday, June 8: The M-38 bridge over the Firesteel River will have lane closures under flag control from 9 a.m. to 3 p.m.
- Tuesday, June 9: The US-45 bridge over the East Branch of the Ontonagon River will have lane closures under flag control from 9 a.m. to 3 p.m.
- Wednesday, June 10: The M-28 bridge over the Ontonagon River will have lane closures under flag control from 9 a.m. to 3 p.m.
- Thursday, June 11: The US-41 bridge over the Sturgeon River will have lane closures under flag control from 9 a.m. to 3 p.m.
These inspections will help ensure continued safe and reliable operation of the bridges.
Media Contact: