Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
I-94 Connected and Automated Vehicle (CAV) Corridor Environmental Assessment
The CAV corridor Environmental Assessment has moved to project status. Learn more about the I-94 Connected and Automated Vehicle (CAV) Corridor Project.
Finding of No Significant Impact (FONSI)
Environmental Assessment
Documents
I-94 CAV Environmental Assessment
- Appendix A - Social and Economic Maps
- Appendix B - Traffic Analysis Technical Report
- Appendix C - Project Area Contamination Survey
- Appendix D - Ecological Desktop Review
- Appendix E - Potential Wetlands Mapping
- Appendix F - Social and Economic Indicators
- Appendix G - Traffic Diversion Tables and Mapping
- Appendix H - MOVES Results
- Appendix I - Visual Impact Analysis Viewpoints
- Appendix J - Local Advisory Committee Members List
- Appendix K - Agency Coordination