Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
Lane closures for M-90, North Branch Flint River bridge improvements begin July 7 in Lapeer County
June 23, 2025
DAVISON, Mich. -The Michigan Department of Transportation (MDOT) is investing approximately $3.5 million to improve M-90 from M-24 to the west village limit of North Branch. Work will include resurfacing, centerline rumble strips, pavement markings and improvements to the North Branch Flint River bridge. Bridge work will include resurfacing, painting, scour protection, substructure repair, deck patching, railing repair, silane treatment, guardrail and approach work.
"Across Michigan, we are moving dirt and fixing the damn roads to grow our economy, helping Michiganders go to work, drop their kids off at school and run errands safely," said Gov. Gretchen Whitmer. "By the end of this construction season, we will have fixed, repaired or replaced nearly 24,500 lane miles of roads and 1,900 bridges, supporting thousands of good-paying, local jobs without raising taxes by a dime. This year, let's build on our momentum to pass a bipartisan local road funding plan so we can keep fixing our damn roads and creating good-paying, local jobs."
County:
Lapeer
Highway:
M-90
Closest community:
North Branch
Start date:
Monday, July 7, 2025
Estimated end date:
Friday, Oct. 17, 2025
Traffic restrictions:
Traffic will be maintained with single-lane and shoulder closures. Flagging operations will be in place on M-90 and a temporary traffic signal on the North Branch Flint River Bridge.
Work on the bridge will begin July 7 and is anticipated to end Oct. 17. Work on M-90 will begin July 15 and is expected to end Aug. 18.
Safety benefit:These improvements will increase driver safety and extend the service lives of both the road and the bridge.
Lane closures during this type of work are necessary to provide the safest work area possible for crews and motorists
Media Contact: