Be aware of fake MDOT texts demanding toll or traffic ticket payments. MDOT does not operate any toll roads. Contact the Michigan Attorney General for information on how to identify scams and file a complaint.
Lane closures on M-63 Blossomland Bridge start May 5 in St. Joseph
April 28, 2025
COLOMA, Mich. - The Michigan Department of Transportation (MDOT) will be inspecting the M-63 Blossomland Bridge over the St. Joseph River, which will require daytime single-lane closures.
MDOT is performing a routine, detailed inspection of the bascule bridge’s structural, mechanical and electrical components. The bridge may lift during this time as part of normal operations; traffic backups are expected with the lane closures.
County:
Berrien
Highway:
M-63
Closest community:
St. Joseph
Start date:
9 a.m. Monday, May 5, 2025
Estimated end date:
3 p.m. Thursday, May 8, 2025
Traffic restrictions:
The right lane will be closed in each direction.
Safety benefit:
The routine inspection will ensure the safe operation of the bascule bridge.
Media Contact: